Own your roof. Own your power.
Residential and commercial solar installations across Madhya Pradesh — with PM Surya Ghar subsidy, 25-year panel warranty, and lifetime operations & maintenance.
- On-Grid, Off-Grid & Hybrid
- PM Surya Ghar Approved Vendor
- Lifetime O&M Service
What your roof earns
Your last unit costs the most. Solar takes that one first.
Madhya Pradesh's domestic tariff is telescopic — the more you use, the dearer every extra unit becomes. A rooftop system removes your dearest units before it touches your cheapest, which is why the saving is larger than an average rate suggests. Enter the units from your last bill and watch it happen.
Printed on your electricity bill as “units consumed”. Don't have it to hand? Tap the closest figure above — the full calculator lets you refine it later.
2.5 kW
₹69,000
₹2,837
Which units solar takes away
- 301+ · ₹7.24− ₹362
- 151–300 · ₹7.05− ₹1,058
- 51–150 · ₹5.67− ₹567
- 1–50 · ₹4.71− ₹212
Across the units solar replaces you avoid ₹6.37 on each one. Your top slab charges ₹7.24 — that is the first rate solar removes, and the ladder is peeled downward from there.
- Bill today
- ₹2,942
- Bill after solar
- ₹105
- Units generated each month
- 345
- Saved over 25 years
- ₹8,23,032
The bill after solar is never zero — the fixed charge stays as long as the connection does, and the figure above includes it. The 25-year total holds today's MPERC tariff flat and applies 0.5% panel degradation a year. Tariffs have risen every year; if they keep rising, the real figure is higher than this one.
Subsidies explained
Don't leave ₹78,000 on the table.
PM Surya Ghar pays ₹30,000 for each of your first two kilowatts and ₹18,000 for the third. After that it pays nothing — a 6 kW system and a 3 kW system receive exactly the same rupee amount. Sizing above 3 kW is often the right call; it is never a subsidy decision.
- ₹30,000
- ₹60,000
- ₹78,000
- ₹78,000
- 1 kW
- 2 kW
- 3 kW
- 6 kW
₹78,000 is a hard ceiling per household, and a 6 kW system reaches it no faster than a 3 kW one. The subsidy follows the panels’ rated capacity, not the inverter — adding batteries, trackers or a small wind hybrid does not add a rupee to it.
How the subsidy actually reaches your bank account
- 01
Register on the National Portal
You register at pmsuryaghar.gov.in with your electricity consumer number. The portal issues an application ID and an e-token — the instrument the subsidy is eventually paid against.
- 02
Choose a vendor and agree the price
There is no DISCOM tendering under this scheme; you negotiate directly at mutually decided rates. Design, components and commercial terms are settled between you and the vendor you pick from the portal.
- 03
Installation, then the portal upload
The system goes up, with safety checks and a handover briefing. System details and every required document — including geo-tagged photographs — are uploaded, and the application moves to your DISCOM.
- 04
DISCOM inspection and meter
The DISCOM physically inspects the plant, signs the metering agreement and installs the net meter. No subsidy is processed before that physical verification.
- 05
Redeem the e-token
The e-token is activated for the amount due on your actual installed capacity. Redeem it and the money is released to the bank account registered on the portal — the guidelines allow 15 days from DISCOM approval. If you financed the system, it clears the loan account first.
- DCR ComplianceMinistry of New and Renewable Energy (MNRE)The Domestic Content Requirement covers solar modules and the cells inside them, and non-DCR modules disqualify the whole system from subsidy. What ALMM List-I and List-II add, how RFID traceability works, and the Give It Up alternative.
- Madhya Pradesh State Solar SubsidyMadhya Pradesh Urja Vikas Nigam Limited (MPUVNL)An honest account of state-level support for rooftop solar in MP — the MPERC fee waivers in force since June 2026, what the MP Renewable Energy Policy 2025 does and does not cover, the state's PM Surya Ghar numbers, and how to check for a cash top-up.
- Net MeteringMPCZ · MPWZ · MPEZ, under MPERC regulationThe rules that actually govern net metering in MP — 500 kW ceiling, 80% transformer limit, 15-day deemed acceptance, ₹500/day delay compensation, the October–September settlement period, and what happens to fixed charges.
- PM Surya Ghar — Muft Bijli YojanaGovernment of India (MNRE)What the central rooftop solar subsidy actually pays — ₹30,000/kWp for the first 2 kWp, ₹18,000 for the third, ₹78,000 ceiling — who qualifies, the ten steps from portal to bank transfer, and where applications stall.
From agreement to commissioning
How a project actually runs.
Typically 4–14 weeks
Six phases, in this order, with the parts nobody advertises left in — the metering agreement, the DCR serial numbers, the inspector’s checklist. Two of the six are paced by your distribution company rather than by us, and we have marked which.
- 012–9 days
Setup
Notarised agreement, registration on the PM Surya Ghar portal where a subsidy applies, vendor selection confirmed on the portal, and the scope and capacity fixed in writing.
- 023–10 days
Procurement
Bill of materials finalised from the survey, stock checked, panels, inverter and mounting structure dispatched, and receipt confirmed on site before anyone is mobilised.
- 032–5 days
Installation
Mounting structure, panels, wiring and inverter, earthing, then a quality checklist. Daily progress reports and photographs, so you can see the roof without standing on it.
- 041–4 weeks
Metering and grid
Net-metering application filed with your DISCOM — or smart-meter activation where RDSS applies — followed by insulation, earth-continuity and I-V curve testing, and a commissioning test run.
▸ DISCOM-paced
- 052–6 weeks
Commissioning
The DISCOM or state authority inspects the plant and issues the commissioning certificate, and the panel and inverter serial numbers go up to the portal as DCR evidence.
▸ DISCOM-paced
- 06Ongoing
Handover and service
Warranty registration, the full document set in your hands, and the service schedule generated automatically. This is where the project ends and the maintenance relationship starts.
The subsidy runs on its own track. Central Financial Assistance is typically released 2–8 weeks after commissioning and holds up none of the phases above — your system generates from the day it is switched on, whether or not the money has landed.
Every kind of solar, end-to-end.
See all services →From a 3 kW rooftop to a 500 kW industrial plant — one team through survey, installation, subsidy, and lifetime O&M.
Where we install
One of three companies will process your file.
Madhya Pradesh's 55 districts are served by three distribution companies, and which one you fall under is set by your revenue division — not by your distance from Bhopal. It decides the portal your net-metering application goes to and the office that inspects your meter. We file it and follow it either way.
MPWZ
15 districtsMadhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited
Head office: Indore
Revenue divisions
Indore · Ujjain
District guides
MPCZ
16 districtsMadhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited
Head office: Bhopal
Revenue divisions
Bhopal · Narmadapuram · Gwalior · Chambal
District guides
MPEZ
24 districtsMadhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited
Head office: Jabalpur
Revenue divisions
Jabalpur · Rewa · Sagar · Shahdol
District guides
Sagar sits closer to Bhopal than Jabalpur does, and is still administered from Jabalpur — the boundary follows the revenue division, not the map. It is the single most common thing applicants get wrong about their own connection, and it costs weeks.
Jurisdiction source: MPCZ (MP Madhya Kshetra Vidyut Vitaran Co. Ltd.) — Company Profile, Jurisdiction — "areas covered by the Commissioners of Bhopal, Hoshangabad, Gwalior, and Chambal" — https://portal.mpcz.in/web/about-us/company-profile
Start with the survey.
The numbers on this page are estimates built from a bill. The number that matters comes from someone standing on your roof with a shade analysis and your sanctioned load in hand. That visit is free and carries no obligation.
- PM Surya Ghar: Muft Bijli Yojana — registered vendor
