What we build
Rooftop and ground-mount solar, engineered end to end — survey, design, DISCOM liaison, installation, and the O&M that keeps it earning.
commercial
व्यावसायिक व औद्योगिक सोलर
Turnkey commercial and industrial solar in MP — why C&I gets no central subsidy, the net-metering rules that actually bind a 100 kW project, contract-demand limits, and how the tariff makes commercial payback shorter than residential.
hybrid
हाइब्रिड सोलर सिस्टम
Hybrid solar gives net-metering economics and outage backup from one inverter. What the regulation requires with storage, why batteries earn no subsidy, and how to size backup so it does not eat the payback.
off grid
ऑफ-ग्रिड सोलर सिस्टम
Fully independent solar with battery storage for sites the grid does not reach. Why off-grid earns no PM Surya Ghar subsidy, how autonomy and sizing actually work, and when a grid extension is the cheaper answer.
on grid
ऑन-ग्रिड सोलर सिस्टम
How grid-tied solar actually works in MP — the net-metering regulation, the deemed-acceptance rules, how export credits are settled each October–September, and when on-grid is the wrong choice.
om
संचालन व रखरखाव
Every subsidised rooftop system carries five years of comprehensive maintenance free of cost. What that entitlement covers, how to tell whether your array is underperforming, and what a maintenance contract should contain after year five.
residential
आवासीय रूफटॉप सोलर
Turnkey residential rooftop solar in Madhya Pradesh — what the subsidy pays, what the equipment must meet under MNRE specification, the net-metering timelines your DISCOM is bound by, and what the whole thing actually takes.
survey
साइट सर्वे
A free on-site survey across Madhya Pradesh. What gets measured — roof area, shading, structure, sanctioned load, transformer headroom — why each one can change the answer, and what you receive afterwards.